Week 3: foundation

A strong, level foundation is a must before building can begin.

Tetris!

Tetris!

The foundation for the main structure.

The foundation for the main structure (i.e. the house).

The east and west retaining walls.

The east and west retaining walls.

Sealer is applied to the mositure-proof the dirt-facing side.

Sealer is applied to the mositure-proof the dirt-facing side.

Plastic tubing for the french drain (or freedom drain if you're so inclined).

Plastic tubing for the french drain (or freedom drain if you're so inclined).