Week 3: foundation

A strong, level foundation is a must before building can begin.

Tetris!

Tetris!

The foundation for the main structure.

The foundation for the main structure (i.e. the house).

The east and west retaining walls.

The east and west retaining walls.

Sealer is applied to the mositure-proof the dirt-facing side.

Sealer is applied to the mositure-proof the dirt-facing side.

Plastic tubing for the french drain (or freedom drain if you're so inclined).

Plastic tubing for the french drain (or freedom drain if you're so inclined).

Advertisements

0 Responses to “Week 3: foundation”



  1. Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s




1133 Tweets

Error: Twitter did not respond. Please wait a few minutes and refresh this page.

July 2008
M T W T F S S
    Aug »
 123456
78910111213
14151617181920
21222324252627
28293031  

Blog Stats

  • 44,553 hits

%d bloggers like this: